Metrology & Logbook
EDP System
Flawless tracking of serialized components, accurate cycle-time deductions on field return, and absolute prevention of overflying parts.
Equipment tracking and compliance solutions tailored for Safran Power Units — engineered to replace your legacy Access 2010 stack.
Based on our initial review of your legacy Access 2010 architecture, we have identified three mission-critical pillars for modernization. Each maps directly to a workstream within the proposed engagement.
Metrology & Logbook
Flawless tracking of serialized components, accurate cycle-time deductions on field return, and absolute prevention of overflying parts.
Quality Management
Secure, controlled-access document management for manuals and work instructions, mapped to your existing approval procedures.
Deployment & Security
Required to align ITAR and CMMC compliance across deployment, access control, and data residency.
Seeing the workflow in action. The following sequence walks the lifecycle of a serialized component from definition through end-of-service alerting.
Data retention target
90—99%
Target data retention from existing MS Access 2010 databases, validated through a structured pre-migration review.
| Workstream | Approach |
|---|---|
| 01 / GoalData Migration | Target 90% to 99% data retention from existing Access 2010 databases, with full reconciliation reports delivered before cutover. |
| 02 / MethodTechnical Approach | Pre-migration schema review to eliminate structural surprises, including dependency mapping and integrity testing on a sandbox replica. |
| 03 / ModuleQCBD Customization | Custom workflow development mapped precisely to your current quality document management procedures, preserving role-based approval chains. |
A short, structured path from this conversation to a formal proposal. We recommend starting with the Technical Discovery Session — the primary input to everything that follows.
A 60–90 minute joint review of your current Access database schema and workflows with our engineering team. The output anchors all subsequent estimates.
Schedule sessionJoint validation of the Compliance Layer scope — required to align ITAR and CMMC compliance requirements across deployment, access control, and data residency.
Compliance scopeDevelopment of a secure, customized data-mapping strategy. Includes target schema, retention plan, validation rules, and rollback approach.
DeliverablesDelivery of a comprehensive scope, timeline, and pricing model within one week of the technical session. Reviewed jointly before signature.
Expected SLA
Thank you, Tony and Jeferson. We are ready to walk through any portion of this proposal in detail and to align on the discovery session timeline.
Company
SOMA Aviation Software
Contact
sales@somasoftware.com
Web
somasoftware.com